These are pictures from my second draft on Google Sketchup - apologies for the 'distant view'. This time i went a little 'all out' on modifying the blob into a more evocative shape, but also worked on different designs for the stairs. I did, however, include the under ground studio (which i didn't in the first draft) and whilst i'm still painfully slow at operating the program, i think i'm making progress (?).
In this second draft, i worked on completing a replica of the metal stairs (see previous post). These were amazing as they appear to be 'folded' from iron or steel. I've chosen a rusted metal render to highlight the industrial nature of them. In saying industrial, i feel it can be linked to the word 'mechanical', which the bottom studio reflects.
The white stairs I imagine to be made out of concrete, maybe pre-moulded to achieve the curves, but i feel they're most effective in white, as it suits the progression up to the the 'blob in the sky'.
No comments:
Post a Comment